15.19Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
Matches DSR 2023Vol 2, pages 1146 to 1147
Rate per kg
3.85
DSR 2023
How this rate is built3 items, 4 additional charges
LabourBandhani, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.