15.21Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres.
Matches DSR 2023Vol 2, pages 1147 to 1148
Rate per height
0.85
DSR 2023
How this rate is built3 items, 4 additional charges
LabourBandhani, Beldar
Loading
Water 1%GSTCPOH 15%Cess 1%
View full rate analysis
See every quantity and rate, and the 4 additional charges with the amount each one is worked out on. Change any rate to see the updated cost, then download the complete working as an Excel file.