15.22Extra for marking of structural steel work required to be re-erected.
Matches DSR 2023Vol 2, page 1148
Rate per kg
4.65
DSR 2023
How this rate is built2 items, 4 additional charges
LabourBeldar, Mistry
Loading
Water 1%GSTCPOH 15%Cess 1%